No front page content has been created yet.

The 34th Street - Hudson Yards station on the #7 line opened on the west side and it is the first addition to the subway system since 1989. VJ Associates was proud to be a part of both the design and construction phases. We provided cost estimating, value engineering, life cycle cost analysis, and cost controls services for the tunnel construction, the 34th Street station, gross passages, and service and ventilation building. Full article here [+]

© 2009 VJ Associates. All Rights Reserved